fbpx

Elcos was chosen to provide 4 generating sets for 250 kVA each to feed as a pock up power the hospital of jeddah, Saudi Arabia

The country typically sees fierce competition for projects with requirements such as lead time making a crucial difference and allowing the award of supply. 

For this hospital in Saudi Arabia, the units were produced to withstand extreme environmental conditions, therefore the temperature rise and insulation class of the alternators were a key consideration for this project. Each unit required certification by SGS on a SABER platform to meet stringent Saudi requirements. 

Each enclosure includes a VOLVO TAD733GE EU2 engine coupled with a STAMFORD UCDI274K alternator. 2 units were wired 400/230V and 2 units were wired 220/127V with a combined total of 1000kVA output, built for this specific application.

The generator sets used in this project were assembled in Our Plant in Italy and transported to the private hospital in Jeddah, Saudi Arabia.

Reliability was essential for this critical project and  ELCOS were able to meet the power requirements. 

admin

Author admin

More posts by admin

Leave a Reply